A continuous time model for multiple yard crane scheduling with last minute job arrivals
Year of publication: |
2012
|
---|---|
Authors: | Li, Wenkai ; Goh, Mark ; Wu, Yong ; Petering, M.E.H. ; de Souza, R. ; Wu, Y.C. |
Published in: |
International Journal of Production Economics. - Elsevier, ISSN 0925-5273. - Vol. 136.2012, 2, p. 332-343
|
Publisher: |
Elsevier |
Subject: | Container yard operations | Continuous time | Scheduling | Rolling-horizon algorithm | Last minute jobs |
-
A continuous time model for multiple yard crane scheduling with last minute job arrivals
Li, Wenkai, (2012)
-
Product differentiation and entry timing in a continuous time spatial competition model
Ebina, Takeshi, (2014)
-
On preemption in discrete and continuous time
Steg, Jan-Henrik, (2016)
- More ...
-
A continuous time model for multiple yard crane scheduling with last minute job arrivals
Li, Wenkai, (2012)
-
Discrete time model and algorithms for container yard crane scheduling
Li, Wenkai, (2009)
-
Discrete time model and algorithms for container yard crane scheduling
Li, Wenkai, (2009)
- More ...