A review of methods and algorithms for optimizing construction scheduling
Year of publication: |
2013
|
---|---|
Authors: | Zhou, J ; Love, P E D ; Wang, X ; Teo, K L ; Irani, Z |
Published in: |
Journal of the Operational Research Society : OR. - Basingstoke, Hampshire : Palgrave, ISSN 0030-3623, ZDB-ID 7160331. - Vol. 64.2013, 8 (21.8.), p. 1091-1105
|
Saved in:
Saved in favorites
Similar items by person