A two-machine flowshop scheduling problem with deteriorating jobs and blocking
Year of publication: |
2010
|
---|---|
Authors: | Lee, Wen-chiung ; Shiau, Yau-ren ; Chen, Shiuan-kang ; Wu, Chin-chia |
Published in: |
International journal of production economics. - Amsterdam [u.a.] : Elsevier, ISSN 0925-5273, ZDB-ID 1092526-0. - Vol. 124.2010, 1, p. 188-197
|
Subject: | Produktionssteuerung | Production control | Scheduling-Verfahren | Scheduling problem | Heuristik | Heuristics | Branch-and-Bound | Branch and Bound | Algorithmus | Algorithm |
-
Heuristic algorithms for a complex parallel machine scheduling problem
Blázsik, Zoltán, (2008)
-
Parallel machines scheduling with a deteriorating maintenance activity
Wang, J.-J., (2011)
-
Parallel machine scheduling to minimize the makespan with sequence dependent deteriorating effects
Ruiz-Torres, Alex J., (2013)
- More ...
-
Lee, Wen-Chiung, (2010)
-
A two-machine flowshop scheduling problem with deteriorating jobs and blocking
Lee, Wen-Chiung, (2010)
-
A two-machine flowshop problem with two agents
Lee, Wen-chiung, (2011)
- More ...