A two-stage three-machine assembly scheduling problem with deterioration effect
Year of publication: |
2019
|
---|---|
Authors: | Wu, Chin-Chia ; Azzouz, Ameni ; Chung, I. Hong ; Lin, Win-Chin ; Said, Lamjed Ben |
Published in: |
International journal of production research. - London [u.a.] : Taylor & Francis, ISSN 1366-588X, ZDB-ID 1485085-0. - Vol. 57.2019, 21, p. 6634-6647
|
Subject: | assembly | branch-and-bound | discrete optimisation | flow shop | simulated annealing | Scheduling-Verfahren | Scheduling problem | Privatisierung | Privatization | Fließfertigung | Assembly-line production | Heuristik | Heuristics | Durchlaufzeit | Lead time | Branch-and-Bound | Branch and Bound | Mathematische Optimierung | Mathematical programming |
-
A two-stage three-machine assembly scheduling problem with a position-based learning effect
Wu, Chin-Chia, (2018)
-
Schaller, Jeffrey, (2013)
-
Nasrollahi, Vahid, (2022)
- More ...
-
Wu, Chin-Chia, (2024)
-
Scheduling problems under learning effects : classification and cartography
Azzouz, Ameni, (2018)
-
An order scheduling problem with position-based learning effect
Xu, Jianyou, (2016)
- More ...