//-->
Effect of rework, rejects and inspection on lot size with work-in-process inventory
Ullah, Misbah, (2014)
Setting optimal production lot sizes and planned lead times in a job shop
Yuan, Rong, (2016)
Impact of random defective rate on lot size focusing work-in-process inventory in manufacturing system
Kang, Chang Wook, (2017)
GRASP heuristic with path-relinking for the multi-plant capacitated lot sizing problem
Nascimento, Mariá C. V., (2009)
A knapsack problem as a tool to solve the production planning problem in small foundries
Camargo, Victor C. B., (2012)
HOPS – Hamming-Oriented Partition Search for production planning in the spinning industry
Camargo, Victor C. B., (2014)