An approach using SAT solvers for the RCPSP with logical constraints
Year of publication: |
2016
|
---|---|
Authors: | Vanhoucke, Mario ; Coelho, José |
Published in: |
European journal of operational research : EJOR. - Amsterdam : Elsevier, ISSN 0377-2217, ZDB-ID 243003-4. - Vol. 249.2016, 2 (1.3.), p. 577-591
|
Subject: | Project scheduling | RCPSP | AND/OR/BI constraints | SAT | Scheduling-Verfahren | Scheduling problem | Projektmanagement | Project management | Theorie | Theory |
-
Quality- and profit-oriented scheduling of flexible resource-constrained projects
Kellenbrink, Carolin, (2014)
-
Scheduling resource-constrained projects with a flexible project structure
Kellenbrink, Carolin, (2015)
-
Profit-oriented scheduling of resource-constrained projects with flexible capacity constraints
Schnabel, André, (2017)
- More ...
-
An evaluation of the adequacy of project network generators with systematically sampled networks
Vanhoucke, Mario, (2008)
-
Multi-mode resource-constrained project scheduling using RCPSP and SAT solvers
Coelho, José, (2011)
-
Truncated branch-and-bound guided meta-heuristics for the unrelated parallel machine
Sels, Veronique, (2011)
- More ...