An optimization framework for solving capacitated multi-level lot-sizing problems with backlogging
Year of publication: |
2011
|
---|---|
Authors: | Wu, Tao ; Shi, Leyuan ; Geunes, Joseph ; Akartunalı, Kerem |
Published in: |
European journal of operational research : EJOR. - Amsterdam : Elsevier, ISSN 0377-2217, ZDB-ID 243003-4. - Vol. 214.2011, 2 (16.10.), p. 428-441
|
Subject: | Losgröße | Lot size | Produktionsplanung | Production planning | Mathematische Optimierung | Mathematical programming | Theorie | Theory |
-
Trigos, Federico, (2016)
-
Synchronisation of scarce resources for a parallel machine lotsizing problem
Almeder, Christian, (2011)
-
Integrating two-dimensional cutting stock and lot-sizing problems
Silva, E., (2014)
- More ...
-
Wu, Tao, (2012)
-
Wu, Tao, (2012)
-
An optimization framework for solving capacitated multi-level lot-sizing problems with backlogging
Wu, Tao, (2011)
- More ...