Analysis of flow lines with Cox-2-distributed processing times and limited buffer capacity
Year of publication: |
2006
|
---|---|
Authors: | Helber, Stefan |
Published in: |
Stochastic modeling of manufacturing systems : advances in design, performance evaluation, and control issues ; with 91 tables. - Berlin : Springer, ISBN 3-540-26579-1. - 2006, p. 55-76
|
Subject: | Fließfertigung | Assembly-line production | Scheduling-Verfahren | Scheduling problem | Theorie | Theory |
-
Complexity of the two-stage no-wait assembly problem with setup and removal times separated
Strusevič, Vitalij Aleksandrovič, (1991)
-
Produktionsplanung : ablauforganisatorische Aspekte
Domschke, Wolfgang, (1997)
-
Optimally solving the Alternative Subgraphs assembly line balancing problem
Scholl, Armin, (2008)
- More ...
-
Scheduling resource-constrained projects with a flexible project structure
Kellenbrink, Carolin, (2013)
-
Quality- and profit-oriented scheduling of flexible resource-constrained projects
Kellenbrink, Carolin, (2014)
-
Wolter, Anja, (2013)
- More ...