Balancing multi-manned assembly lines with walking workers : problem definition, mathematical formulation, and an electromagnetic field optimisation algorithm
Year of publication: |
2019
|
---|---|
Authors: | Şahin, Murat ; Kellegöz, Talip |
Subject: | assembly line balancing | electromagnetic field optimisation | multi-manned | walking workers | Fließfertigung | Assembly-line production | Mathematische Optimierung | Mathematical programming | Algorithmus | Algorithm | Theorie | Theory | Scheduling-Verfahren | Scheduling problem |
-
Solving a multi-manned assembly line balancing problem in a Pareto sense
Chutima, Parames, (2019)
-
Naderi, Bahman, (2019)
-
Robust balancing of straight assembly lines with inerval task times
Gurevsky, E., (2013)
- More ...
-
A simulated annealing heuristic for the capacitated location routing problem
Kellegöz, Talip, (2010)
-
A genetic algorithm for the stochastic mixed-model U-line balancing and sequencing problem
Özcan, Uğur, (2011)
-
Kellegöz, Talip, (2012)
- More ...