Beyond manufacturing resource planning (MRP II) : advanced models and methods for production planning ; with 36 tables
Year of publication: |
1998
|
---|---|
Other Persons: | Drexl, Andreas (ed.) ; Kimms, Alf (contributor) |
Publisher: |
Berlin : Springer |
Subject: | Produktionsplanung | Production planning | Materialwirtschaft | Materials management | Losgröße | Lot size | Scheduling-Verfahren | Scheduling problem | Produktionssteuerung | Production control | Mathematische Optimierung | Mathematical programming | Theorie | Theory | MRP II | Losgrößenmodell | Reihenfolgeproblem | Modell |
Description of contents: | Table of Contents [gbv.de] ; Table of Contents [loc.gov] ; Description [swbplus.bsz-bw.de] ; Description [loc.gov] |
Published items: |
9 hits in ECONIS - Online Catalogue of the ZBW
|
Extent: | VIII, 419 S. graph. Darst. |
---|---|
Type of publication: | Book / Working Paper |
Type of publication (narrower categories): | Aufsatzsammlung ; Sammelwerk ; Collection of articles of several authors |
Language: | English |
Notes: | Includes bibliographical references Literaturangaben Enth. 15 Beitr. Pp. : DM 148.00 |
ISBN: | 3-540-64247-1 |
Classification: | Fertigung |
Source: | ECONIS - Online Catalogue of the ZBW |
-
Lot-sizing and scheduling for flexible flow lines
Quadt, Daniel, (2004)
-
"Losüberlappung" : Verfahren zur Effektivitätssteigerung in der operativen Produktionsplanung
Feldmann, Martin, (2005)
-
"Losüberlappung" : Verfahren zur Effektivitätssteigerung in der operativen Produktionsplanung
Feldmann, Martin, (2005)
- More ...
-
Minimizing total weighted completion times subject to precedence constraints by dynamic programming
Drexl, Andreas, (1998)
-
Optimization guided lower and upper bounds for the resource investment problem
Drexl, Andreas, (1998)
-
Belastungsorientierte Just-in-Time Variantenfließfertigung
Drexl, Andreas, (1999)
- More ...