Development of a hybrid metaheuristic to minimise earliness and tardiness in a hybrid flowshop with sequence-dependent setup times
Year of publication: |
2010
|
---|---|
Authors: | Behnamian, J. ; Fatemi Ghomi, S. M. T. ; Zandieh, M. |
Published in: |
International journal of production research. - London : Taylor & Francis, ISSN 0020-7543, ZDB-ID 160477-6. - Vol. 48.2010, 5/6 (1/15.3.), p. 1415-1438
|
Subject: | Fließfertigung | Assembly-line production | Scheduling-Verfahren | Scheduling problem | Heuristik | Heuristics | Algorithmus | Algorithm |
-
Pereira, Jordi, (2018)
-
Yu, Jae-Min, (2017)
-
Henke, Thomas, (2022)
- More ...
-
A multi-phase covering Pareto-optimal front method to multi-objective parallel machine scheduling
Behnamian, J., (2010)
-
Behnamian, J., (2017)
-
An iterative method for forecasting most probable point of stochastic demand
Behnamian, J., (2014)
- More ...