Economic optimization of off-line inspection with rework consideration
This paper addresses issues relating to off-line inspection with rework consideration. We develop a mathematical model to determine the first unit inspected and the average number to be inspected in a batch, assuming the involvement of a quality-control department with a standard procedure. Numerical analyses are used to simulate the effect of changes in the various parameters on the optimal solution when the probability of a transition between states follows the discrete Weibull distribution.
Year of publication: |
2009
|
---|---|
Authors: | Wang, Wen-Ying ; Sheu, Shey-Huei ; Chen, Yan-Chun ; Horng, Der-Juinn |
Published in: |
European Journal of Operational Research. - Elsevier, ISSN 0377-2217. - Vol. 194.2009, 3, p. 807-813
|
Publisher: |
Elsevier |
Keywords: | Dynamic programming Quality control Optimization Off-line inspection Rework |
Saved in:
Online Resource
Saved in favorites
Similar items by person
-
Economic optimization of off-line inspection with rework consideration
Wang, Wen-Ying, (2009)
-
Wang, Wen-ying, (2008)
-
Duh, Rong-Ruey, (2009)
- More ...