Effects of Measurement Error on Controlling Two Dependent Process Steps
Year of publication: |
2007
|
---|---|
Authors: | Yang, Su-Fen ; Ho, Han-Wei ; Rahim, M. A. |
Published in: |
Stochastics and Quality Control. - Walter de Gruyter GmbH & Co. KG, ISSN 2367-2404, ZDB-ID 2905267-1. - Vol. 22.2007, 1, p. 127-139
|
Publisher: |
Walter de Gruyter GmbH & Co. KG |
Subject: | Imprecise measurement | dependent process steps | average run length |
-
Phase II monitoring of auto-correlated linear profiles using linear mixed model
Narvand, A., (2013)
-
Charts for Detecting Small Shifts
Sivasamy, R., (2003)
-
Run Length Variability and Three Sigma Control Limits
Govindaraju, K., (2004)
- More ...
-
Minimum loss design of asymmetric X̄ and S control charts under two independent Weibull shocks
Yang, Su-fen, (2009)
-
Optimal variable sample size and sampling interval "mean squared error" chart
Yang, Chih-ching, (2013)
-
A two-phase preventive maintenance policy considering imperfect repair and postponed replacement
Li, Yang, (2019)
- More ...