End-year China wind power installation rush reduces electric system reliability
Year of publication: |
2024
|
---|---|
Authors: | Li, Jianglong ; Ho, Mun S. |
Published in: |
Energy economics. - Amsterdam [u.a.] : Elsevier Science, ISSN 1873-6181, ZDB-ID 2000893-4. - Vol. 133.2024, Art.-No. 107507, p. 1-9
|
Subject: | China | Electric reliability | End-year installation rush | Wind power | Windenergie | Wind energy | Elektrizitätswirtschaft | Electric power industry | Windenergieanlage | Wind turbine |
-
Lin, Boqiang, (2023)
-
Is there a future for nuclear power? : wind and emission reduction targets in Alberta
Van Kooten, Gerrit C., (2016)
-
A stakeholder analysis of investments in wind power electricity generation in Ontario
Bahramian, Pejman, (2021)
- More ...
-
Indirect cost of renewable energy : insights from dispatching
Li, Jianglong, (2022)
-
Li, Jianglong, (2024)
-
Li, Jianglong, (2023)
- More ...