Energy consumption control in the two-machine Bernoulli serial production line with setup and idleness
Year of publication: |
2023
|
---|---|
Authors: | Pei, Zhi ; Yang, Peiqi ; Wang, Yujuan ; Yan, Chao-Bo |
Published in: |
International journal of production research. - London [u.a.] : Taylor & Francis, ISSN 1366-588X, ZDB-ID 1485085-0. - Vol. 61.2023, 9, p. 2917-2936
|
Subject: | Bernoulli machine | energy consumption | heuristics | nonlinear polynomial optimisation | Serial production line | Energiekonsum | Energy consumption | Heuristik | Heuristics | Serienfertigung | Serial production | Theorie | Theory | Produktionssteuerung | Production control | Mathematische Optimierung | Mathematical programming | Scheduling-Verfahren | Scheduling problem | Fließfertigung | Assembly-line production | Durchlaufzeit | Lead time |
-
Zhang, Sicheng, (2018)
-
Minimizing energy consumption and makespan in a two-machine flowshop scheduling problem
Mansouri, S. Afshin, (2016)
-
Kim, Woo-sung, (2015)
- More ...
-
Raw material release rates to ensure desired production lead time in Bernoulli serial lines
Biller, Stephan, (2013)
-
Yan, Chao-Bo, (2021)
-
Raw material release rates to ensure desired production lead time in Bernoulli serial lines
Biller, Stephan, (2013)
- More ...