Energy-oriented bi-objective optimization for the tempered glass scheduling
Year of publication: |
2019
|
---|---|
Authors: | Liu, Ming ; Yang, Xuenan ; Chu, Feng ; Zhang, Jiantong ; Chu, Chengbin |
Published in: |
Omega : the international journal of management science. - Oxford [u.a.] : Elsevier, ISSN 0305-0483, ZDB-ID 124502-8. - Vol. 90.2020, p. 1-21
|
Subject: | Scheduling | Bi-objective optimization | Tempered glass | Makespan | Electricity cost | Theorie | Theory | Scheduling-Verfahren | Scheduling problem | Elektrizitätswirtschaft | Electric power industry | Mathematische Optimierung | Mathematical programming | Durchlaufzeit | Lead time |
-
Bi-objective optimization of single-machine batch scheduling under time-of-use electricity prices
Cheng, Junheng, (2016)
-
Minh Hung Ho, (2022)
-
Scheduling on a two-machine permutation flow shop under time-of-use electricity tariffs
Wang, Shijin, (2018)
- More ...
-
Scheduling a tempered glass manufacturing system : a three-stage hybrid flow shop model
Liu, Ming, (2017)
-
Energy-oriented bi-objective optimisation for a multi-module reconfigurable manufacturing system
Liu, Ming, (2019)
-
An FPTAS for uniform machine scheduling to minimize makespan with linear deterioration
Liu, Ming, (2012)
- More ...