Heterogeneous prestressed precast beams multiperiod production planning problem : modeling and solution methods
Year of publication: |
2021
|
---|---|
Authors: | Araújo, Kennedy A. G. ; Bonates, Tibérius O. ; Prata, Bruno A. ; Pitombeira-Neto, Anselmo Ramalho |
Subject: | Prestressed concrete | Precast beams | Modular construction | Integer linear programming | Size reduction heuristics | Mathematische Optimierung | Mathematical programming | Theorie | Theory | Heuristik | Heuristics | Produktionsplanung | Production planning | Ganzzahlige Optimierung | Integer programming |
-
Ríos-Solís, Yasmín Á., (2020)
-
Lagrangian relaxation based heuristic for an integrated production and maintenance planning problem
Alaoui-Selsouli, M., (2012)
-
Progressive selection method for the coupled lot-sizing and cutting-stock problem
Wu, Tao, (2017)
- More ...
-
Pitombeira-Neto, Anselmo Ramalho, (2020)
-
Pitombeira-Neto, Anselmo Ramalho, (2020)
-
Logical analysis of data—An overview: From combinatorial optimization to medical applications
Hammer, Peter L., (2006)
- More ...