Hierarchical Production Planning in a Stochastic Manufacturing System with Long-Run Average Cost : Asymptotic Optimality and Error Bounds
Year of publication: |
2008
|
---|---|
Authors: | Sethi, Suresh ; Zhang, Hanqin ; Zhang, Qing |
Publisher: |
[S.l.] : SSRN |
Subject: | Theorie | Theory | Produktionsplanung | Production planning | Stochastischer Prozess | Stochastic process | Produktionssystem | Manufacturing system | Produktionssteuerung | Production control | Markov-Kette | Markov chain |
Extent: | 1 Online-Ressource (32 p) |
---|---|
Type of publication: | Book / Working Paper |
Language: | English |
Notes: | Nach Informationen von SSRN wurde die ursprüngliche Fassung des Dokuments January 1998 erstellt |
Other identifiers: | 10.2139/ssrn.1125453 [DOI] |
Classification: | M11 - Production Management ; C61 - Optimization Techniques; Programming Models; Dynamic Analysis |
Source: | ECONIS - Online Catalogue of the ZBW |
-
Hierarchical Production and Setup Scheduling in Stochastic Manufacturing Systems
Sethi, Suresh, (2017)
-
Zhang, Qing, (2008)
-
Sethi, Suresh, (2008)
- More ...
-
Average-cost control of stochastic manufacturing systems
Sethi, Suresh P., (2005)
-
On Optimality of Stochastic N-Machine Flowshop with Long-Run Average Cost
Presman, Ernst, (2014)
-
Optimal Production Planning in a Stochastic N-machine Flowshop with Long-Run Average Cost
Presman, Ernst, (2008)
- More ...