- 1. Introduction
- 2. The Manufacturing Network Configuration Problem: Literature Review and Synthesis
- 3. Risk Pooling Benefit of Process Plant Networks: A Simple Demonstration
- 4. A Two-stage Optimization Model for the Network Configuration Problem
- 4.1 Two-stage Model for a Process Plant Network
- 4.2 Two -stage Model for a Product Plant network
- 4.3 Comparing the Performance of Product and Process Plant Networks
- 5. Numerical Examples with Uniform Demand Distribution
- 5.1 Results for a Two-stage Model for a Process Plant Network with Uniform Demand
- 5.2 Network Configuration Choice with Uniform demand
- 6. Conclusions and Future Research
- Appendix
- References
Persistent link: https://www.econbiz.de/10005869516