A mathematical model for the design of distributed layout by considering production planning and system reconfiguration over multiple time periods
Year of publication: |
2015
|
---|---|
Authors: | Shafigh, Farhad ; Defersha, Fantahun M. ; Moussa, Soha Eid |
Published in: |
Journal of industrial engineering international. - Heidelberg : SpringerOpen, ISSN 2251-712X, ZDB-ID 2664907-X. - Vol. 11.2015, p. 283-295
|
Subject: | Distributed layout | Dynamic reconfiguration | Production planning | Mixed integer linear programming | Theorie | Theory | Mathematische Optimierung | Mathematical programming | Produktionsplanung |
Type of publication: | Article |
---|---|
Type of publication (narrower categories): | Aufsatz in Zeitschrift ; Article in journal |
Language: | English |
Other identifiers: | 10.1007/s40092-015-0102-1 [DOI] hdl:10419/157446 [Handle] |
Source: | ECONIS - Online Catalogue of the ZBW |
-
Synchronisation of scarce resources for a parallel machine lotsizing problem
Almeder, Christian, (2011)
-
Production planning problems with joint service-level guarantee : a computational study
Jiang, Yuchen, (2017)
-
Formations and heuristics for the multi-item uncapacitated lot-sizing problem with inventory bounds
Melo, Rafael A., (2017)
- More ...
-
Shafigh, Farhad, (2015)
-
Moussa, Soha Eid, (1998)
-
Defersha, Fantahun M., (2008)
- More ...