Minimizing the sum of maximum earliness and maximum tardiness in the single-machine scheduling problem with sequence-dependent setup time
Year of publication: |
2011
|
---|---|
Authors: | Nekoiemehr, N. ; Moslehi, G. |
Published in: |
Journal of the Operational Research Society : OR. - Basingstoke, Hampshire : Palgrave, ISSN 0030-3623, ZDB-ID 716033-1. - Vol. 62.2011, 7, p. 1403-1412
|
Subject: | Scheduling-Verfahren | Scheduling problem | Durchlaufzeit | Lead time | Branch-and-Bound | Branch and Bound | Algorithmus | Algorithm | Fließfertigung | Assembly-line production | Theorie | Theory | Produktionsplanung | Production planning | Heuristik | Heuristics |
-
A two-stage three-machine assembly scheduling problem with a position-based learning effect
Wu, Chin-Chia, (2018)
-
A two-stage three-machine assembly scheduling problem with deterioration effect
Wu, Chin-Chia, (2019)
-
Talens, Carla, (2024)
- More ...
-
Two-machine flow shop scheduling to minimize the sum of maximum earliness and tardiness
Moslehi, G., (2009)
-
Two-machine flow shop scheduling to minimize the sum of maximum earliness and tardiness
Moslehi, G., (2009)
-
Two-machine flow shop scheduling to minimize the sum of maximum earliness and tardiness
Moslehi, G., (2009)
- More ...