Multi-objective optimisation in flexible assembly job shop scheduling using a distributed ant colony system
Year of publication: |
2020
|
---|---|
Authors: | Zhang, Sicheng ; Li, Xiang ; Zhang, Bowen ; Wang, Shouyang |
Published in: |
European journal of operational research : EJOR. - Amsterdam : Elsevier, ISSN 0377-2217, ZDB-ID 243003-4. - Vol. 283.2020, 2 (1.6.), p. 441-460
|
Subject: | Ant colony optimisation | Flexible assembly job shop scheduling | Meta-heuristics | Multi-objective optimisation | Scheduling | Scheduling-Verfahren | Scheduling problem | Heuristik | Heuristics | Evolutionärer Algorithmus | Evolutionary algorithm | Multikriterielle Entscheidungsanalyse | Multi-criteria analysis | Fließfertigung | Assembly-line production | Produktionssteuerung | Production control | Mathematische Optimierung | Mathematical programming | Durchlaufzeit | Lead time |
-
Shoaardebili, Niloofar, (2015)
-
Kucukkoc, Ibrahim, (2014)
-
Order-oriented cooperative sequencing optimisation in multi-mix-model assembly lines
Jiang, Zhaoliang, (2012)
- More ...
-
Zhang, Sicheng, (2021)
-
Optimal pricing of customized bus services and ride-sharing based on a competitive game model
Li, Yanan, (2021)
-
Zhang, Sicheng, (2024)
- More ...