Optimization-Based Manufacturing Scheduling with Multiple Resources, Setup Requirements, and Transfer Lots
Year of publication: |
2003
|
---|---|
Authors: | Chen, Dong ; Luh, Peter B. ; Thakur, Lakshman S. ; Moreno Jr, Jack |
Published in: |
IIE transactions / Institute of Industrial Engineers, Norcross, Ga : industrial engineering and development. - Philadelphia, Pa : Taylor & Francis, ISSN 0569-5554, ZDB-ID 2460191. - Vol. 35.2003, 10, p. 973
|
Saved in:
Saved in favorites
Similar items by person
-
Shapley value-based payment calculation for energy exchange between micro- and utility grids
Pilling, Robin, (2017)
-
Luh, Peter B., (2010)
-
Shapley value-based payment calculation for energy exchange between micro- and utility grids
Pilling, Robin, (2017)
- More ...