Sequencing minimum product sets on mixed-model U-lines to minimise work overload
Year of publication: |
2012
|
---|---|
Authors: | Li, Jinlin ; Gao, Jie ; Sun, Linyan |
Published in: |
International journal of production research. - London : Taylor & Francis, ISSN 0020-7543, ZDB-ID 160477-6. - Vol. 50.2012, 18 (15.9.), p. 4977-4993
|
Subject: | assembly lines | minimum product set | mixed model sequencing | overload | U-lines | Theorie | Theory | Scheduling-Verfahren | Scheduling problem | Fließfertigung | Assembly-line production | Produktionssteuerung | Production control |
-
A reactive scheduling method for disturbances in aircraft moving assembly line
Zhu, Hongwei, (2021)
-
A note on "orkload smoothing in simple assembly line balancing"
Walter, Rico, (2020)
-
Workload smoothing in simple assembly line balancing
Azizoğlu, Meral, (2018)
- More ...
-
Sequencing minimum product sets on mixed-model U-lines to minimise work overload
Li, Jinlin, (2012)
-
Balancing manual mixed-model assembly lines using overtime work in a demand variation envornment
Li, Jinlin, (2014)
-
Balancing mixed-model assembly lines with adjacent task duplication
Yang, Caijun, (2014)
- More ...