Simultaneous job scheduling and tool replacement based on tool reliability by proposed Tabu-SA algorithm
Year of publication: |
2009
|
---|---|
Authors: | Kolahan, Farhad ; Sharifinya, Ahmad |
Published in: |
Journal of scientific and industrial research : JSIR. - New Delhi : Council, ISSN 0022-4456, ZDB-ID 4104080. - Vol. 68.2009, 6, p. 496-504
|
Saved in:
Saved in favorites
Similar items by person
-
Moghaddam, Masoud Azadi, (2016)
-
Moghaddam, Masoud, Azadi, (2016)
-
Reliability‐based Design for Damping Behavior of Inner Mass Single‐unit Impact Dampers
Afsharfard, Aref, (2013)
- More ...