Stochastic program for disassembly lot-sizing under uncertain component refurbishing lead times
Year of publication: |
2022
|
---|---|
Authors: | Slama, Ilhem ; Ben-Ammar, Oussama ; Thevenin, Simon ; Dolgui, Alexandre ; Masmoudi, Faouzi |
Published in: |
European journal of operational research : EJOR. - Amsterdam : Elsevier, ISSN 0377-2217, ZDB-ID 243003-4. - Vol. 303.2022, 3 (16.12.), p. 1183-1198
|
Subject: | Capacitated disassembly lot-sizing | Combinatorial optimization | Monte-Carlo sampling | Rolling horizon strategy | Stochastic refurbishing lead time | Theorie | Theory | Stochastischer Prozess | Stochastic process | Losgröße | Lot size | Mathematische Optimierung | Mathematical programming | Durchlaufzeit | Lead time | Produktionsplanung | Production planning |
-
Altendorfer, Klaus, (2019)
-
A closed-loop supply chain for deteriorating products under stochastic container return times
Kim, Taebok, (2014)
-
Louly, Mohamed-Aly, (2013)
- More ...
-
An overview on human-centred technologies, measurements and optimisation in assembly systems
Slama, Rim, (2024)
-
Thevenin, Simon, (2022)
-
Optimal order release dates for two-level assembly systems with stochastic lead times at each level
Ben-Ammar, Oussama, (2018)
- More ...