Stochastic program for disassembly lot-sizing under uncertain component refurbishing lead times
| Year of publication: |
2022
|
|---|---|
| Authors: | Slama, Ilhem ; Ben-Ammar, Oussama ; Thevenin, Simon ; Dolgui, Alexandre ; Masmoudi, Faouzi |
| Published in: |
European journal of operational research : EJOR. - Amsterdam : Elsevier, ISSN 0377-2217, ZDB-ID 243003-4. - Vol. 303.2022, 3 (16.12.), p. 1183-1198
|
| Subject: | Capacitated disassembly lot-sizing | Combinatorial optimization | Monte-Carlo sampling | Rolling horizon strategy | Stochastic refurbishing lead time | Theorie | Theory | Stochastischer Prozess | Stochastic process | Losgröße | Lot size | Mathematische Optimierung | Mathematical programming | Durchlaufzeit | Lead time | Produktionsplanung | Production planning |
-
Altendorfer, Klaus, (2019)
-
Economic production quantity for a decaying item with stochastic demand and positive lead time
Castellano, Davide, (2024)
-
A capacitated lot sizing problem with stochastic setup times and overtime
Taş, Duygu, (2019)
- More ...
-
Ben-Ammar, Oussama, (2020)
-
Optimization of multi-period supply planning under stochastic lead times and a dynamic demand
Ben-Ammar, Oussama, (2019)
-
Planned lead times optimization for multi-level assembly systems under uncertainties
Ben-Ammar, Oussama, (2018)
- More ...