The assembly line balancing and scheduling problem with sequence-dependent setup times: Problem extension, model formulation and efficient heuristics
Year of publication: |
2009
|
---|---|
Authors: | Scholl, Armin ; Boysen, Nils ; Fliedner, Malte |
Institutions: | Wirtschaftswissenschaftliche Fakultät, Friedrich-Schiller-Universität Jena |
Subject: | Assembly line balancing | Mass-production | Combinatorial optimization | Setup time | Scheduling |
-
The sequence-dependent assembly line balancing problem
Scholl, Armin, (2006)
-
Becker, Christian, (2008)
-
Optimally solving the Alternative Subgraphs Assembly Line Balancing Problem
Scholl, Armin, (2008)
- More ...
-
Solving symmetric mixed-model multi-level just-in-time scheduling problems
Fliedner, Malte, (2008)
-
Production Planning of Mixed-Model Assembly Lines: Overview and Extensions
Boysen, Nils, (2007)
-
The sequence-dependent assembly line balancing problem
Scholl, Armin, (2006)
- More ...