The optimal number of used machines in a two-stage flexible flowshop scheduling problem
Year of publication: |
2014
|
---|---|
Authors: | Gerstl, Enrique ; Mosheiov, Gur |
Published in: |
Journal of scheduling. - New York, NY : Springer Science + Business Media LLC, ISSN 1094-6136, ZDB-ID 1492486-9. - Vol. 17.2014, 2, p. 199-210
|
Subject: | Scheduling | Sequencing | Deterministic | Flowshop | Makespan | Flowtime | Scheduling-Verfahren | Scheduling problem | Durchlaufzeit | Lead time | Theorie | Theory | Heuristik | Heuristics | Algorithmus | Algorithm | Evolutionärer Algorithmus | Evolutionary algorithm | Produktionssteuerung | Production control | Fließfertigung | Assembly-line production |
-
Yang, Shengluo, (2021)
-
Aydilek, Asiye, (2015)
-
Fernandez-Viagas, Victor, (2017)
- More ...
-
The single machine CON problem with unavailability period
Gerstl, Enrique, (2021)
-
Single machine scheduling to maximize the number of on-time jobs with generalized due-dates
Gerstl, Enrique, (2020)
-
Scheduling on a proportionate flowshop to minimise total late work
Gerstl, Enrique, (2019)
- More ...