No-wait scheduling of a two-machine flow-shop to minimise the makespan under non-availability constraints and different release dates
Year of publication: |
2011
|
---|---|
Authors: | Chihaoui, Faten Ben ; Kacem, Imed ; Hadj-Alouane, Atidel B. ; Dridi, Najoua ; Rezg, Nidhal |
Published in: |
International journal of production research. - London : Taylor & Francis, ISSN 0020-7543, ZDB-ID 160477-6. - Vol. 49.2011, 19/21 (1/1.10/11.), p. 6273-6286
|
Subject: | Fließfertigung | Assembly-line production | Scheduling-Verfahren | Scheduling problem | Durchlaufzeit | Lead time | Branch-and-Bound | Branch and Bound |
-
A two-stage three-machine assembly scheduling problem with deterioration effect
Wu, Chin-Chia, (2019)
-
Luo, JianChao, (2019)
-
Sung, Chang Sup, (2009)
- More ...
-
Ben Chihaoui, Faten, (2011)
-
Fekih, Asma, (2020)
-
Hadda, Hatem, (2010)
- More ...