GAO, QIANG; LU, XIWEN - In: Asia-Pacific Journal of Operational Research (APJOR) 31 (2014) 01, pp. 1450002-1
A two-machine flow shop scheduling problem with rejection is considered in this paper. The objective is to minimize the sum of makespan of accepted operations and total penalty of rejected operations. Each job has two operations that could be rejected, respectively. Operations on the first...