Wang, Liping; Greenberg, Steve; Fiegel, John; … - In: Applied Energy 102 (2013) C, pp. 1382-1390
to improper equipment installation, equipment degradation, sensor failures, or incorrect control sequences. Commissioning … or optimum operation. An existing office building is used as a case study to demonstrate the process of commissioning … commissioning measure is quantified with a calibrated building simulation model. An actual energy saving of 10% was realized after …