Dutta, Animesh; Dutta, Shantanu; Basu, Prabir - In: International Journal of Global Energy Issues 26 (2006) 1/2, pp. 6-42
A techno-economic feasibility study has been conducted to investigate the revamping of two 32 MWe Pulverised-Coal (PC …) boilers with a number of firing options. The options investigated were: (1) conventional PC revamping, (2) replacement with a … new PC boiler, (3) PC to Circulating Fluidised Bed (CFB) revamping, (4) replacement with a new CFB boiler, and (5 …