Showing 1 - 2 of 2
This report estimates the local economic impacts that could be anticipated from the development of a 100 megawatt (MW) geothermal power plant in eastern Whatcom County, Washington, near Mt. Baker, as shown in Figure 1. The study was commissioned by the Bonneville Power Administration to quantify...
Persistent link: https://www.econbiz.de/10009436005
in the determination of royalty income, as well as, tabled results of the royalty runs (detailed in Appendix G). The … transmission cost. Individual data sheets for each KGRA royalty income run are presented in Appendix G. …
Persistent link: https://www.econbiz.de/10009436258