This paper introduces a new general framework for genetic algorithms to solve a broad range of optimization problems. When designing a genetic algorithm, there may be several alternatives for a component such as crossover, mutation or decoding procedure, and it may be difficult to determine the...
Persistent link: https://www.econbiz.de/10011734932
Resource-constrained project scheduling under a net present value objective attracts growing interest. Because this is an NP-hard problem, it is unlikely that optimum solutions can be computed for large instances. Thus, heuristics have become a popular research field. Up to now, however, tight...
Persistent link: https://www.econbiz.de/10011734980
Persistent link: https://www.econbiz.de/10011787442
We consider the multi-mode resource-constrained project scheduling problem. The focus is on an algorithm which is supposed to find a makespan optimal solution. This algorithm has been presented in a recent paper by Speranza and Vercellis. The correctness of the algorithm is examined. Moreover,...
Persistent link: https://www.econbiz.de/10011739501
We consider an extension of the classical resource-constrained project scheduling problem (RCPSP), which covers discrete resource-resource and time-resource tradeoffs. As a result a project scheduler is permitted to identify several alternatives or modes of accomplishment for each activity of...
Persistent link: https://www.econbiz.de/10011743239
NP-completeness and other complexity proofs often merely State that the problem at hand is a generalization of some other intractable problem. This proof technique relies on the widely accepted assumption that complexity results hold regardless of the model formulation used to represent the...
Persistent link: https://www.econbiz.de/10011744028
This paper addresses methods for formulating and solving a general class of nonpreemptive resource-constrained project scheduling problems in which job durations are discrete functions of committed renewable, nonrenewable and doubly-constrained resources (multi-mode time resource tradeoff). We...