Showing 1 - 10 of 49
Investment projects consist of activities which are interrelated by techno-logical and resource constraints. The timing of payments depends on the scheduling of the activities which is not known a priory. Hence, the decision to be made, is to find a feasible Investment schedule with maximum net...
Persistent link: https://www.econbiz.de/10011808794
We consider the classical resource-constrained project scheduling problem (RCPSP). The paper gives a detailed algorithmic description and provides theoretical results on two widely known problem specific heuristics: The serial and the parallel scheduling scheme. An in-depth computational study...
Persistent link: https://www.econbiz.de/10011739559
We review the well-known RSM priority rule to solve the resource constrained project scheduling problem. A detailed analysis of this rule reveals that it is based on assumptions which do not hold in general and hence might lead to poor solutions. Consequently, an improved RSM priority rule is...
Persistent link: https://www.econbiz.de/10011739746
Persistent link: https://www.econbiz.de/10011558729
We consider the problem of scheduling multiple, large-scale, make-to-order assemblies under resource, assembly area, and part availability constraints. Such problems typically occur in the assembly of high volume, discrete make-to-order products. Based on a list scheduling procedure which has...
Persistent link: https://www.econbiz.de/10011558732
Persistent link: https://www.econbiz.de/10011558734
Persistent link: https://www.econbiz.de/10011558740
Since its advent, the 'just-in-time'-paradigm has considerable influence on production planning and control. While originally employed for high-volume production, 'just-in-time'-concepts are meanwhile documented for low-volume, make-to-order production as well. An example is the assembly of...
Persistent link: https://www.econbiz.de/10011583017
Der vorliegende Beitrag beschreibt neuere Entwicklungen der computergestützten Projektplanung. Im Mittelpunkt steht das sogenannte Resource-Constrained Project Scheduling Problem, ein Modell, das explizit oder implizit Softwarepaketen zum Projektmanagement zugrundeliegt. Basierend auf einer...
Persistent link: https://www.econbiz.de/10011594616
We present a set of benchmark instances for the evaluation of Solution procedures for single- and multi-mode resource-constrained project scheduling problems. The instances have been systematically generated by the Standard project generator ProGen. They are characterized by the input-parameters...
Persistent link: https://www.econbiz.de/10011594623