Showing 1 - 10 of 11
Persistent link: https://www.econbiz.de/10011658750
Persistent link: https://www.econbiz.de/10010424263
Persistent link: https://www.econbiz.de/10003977601
Persistent link: https://www.econbiz.de/10003617118
Persistent link: https://www.econbiz.de/10003621807
The proactive and reactive resource-constrained project scheduling problem (PR-RCPSP), that has been introduced recently (Davari and Demeulemeester, 2016a), deals with activity duration uncertainty in a very unique way. The optimal solution to an instance of the PR-RCPSP is a proactive and...
Persistent link: https://www.econbiz.de/10012955410
Uncertainty has become an inevitable aspect of project scheduling. We study the resource-constrained project scheduling problem (RCPSP) with stochastic durations. One of the most studied approaches to deal with stochastic durations is that of proactive and reactive scheduling. In this paper, we...
Persistent link: https://www.econbiz.de/10012993479
In order to cope with the uncertainty inherent in practical project management, proactive and/or reactive strategies can be used. Proactive strategies try to anticipate future disruptions by incorporating slack time or excess resource availability into the schedule, whereas reactive strategies...
Persistent link: https://www.econbiz.de/10012725484
The classical, deterministic resource-constrained project scheduling problem has been the subject of a great deal of research during the previous decades. This is not surprising given the high practical relevance of this scheduling problem. Nevertheless, extensions are needed to be better able...
Persistent link: https://www.econbiz.de/10012725523
The multi-mode resource-constrained project scheduling problem (MRCPSP) involves the determination of a baseline schedule of the project activities, which can be executed in multiple modes, satisfying the precedence relations and resource constraints while minimizing the project duration. During...
Persistent link: https://www.econbiz.de/10014213596