Showing 1 - 10 of 59
A recurring problem in project management involves the allocation of scarce resources to the individual jobs comprising the project. In many situations such as audit scheduling, the resources correspond to individuals (skilled labour). This naturally leads to an assignment type project...
Persistent link: https://www.econbiz.de/10011745621
Persistent link: https://www.econbiz.de/10011806934
Persistent link: https://www.econbiz.de/10011806935
Persistent link: https://www.econbiz.de/10011806937
Persistent link: https://www.econbiz.de/10011806938
In project management, the project duration can often be compressed by accelerating some of its activities at an additional expense. This is the so-called time-cost tradeoff problem which has been extensively studied in the past. However, the discrete version of the problem which is of great...
Persistent link: https://www.econbiz.de/10011734645
Persistent link: https://www.econbiz.de/10011735548
Over the years numerous branch-and-bound procedures for solving the resource-constrained project scheduling problem have been developed. Enumerating delaying alternatives, extension alternatives, feasible posets, feasible sequences or feasible subsets, they all aim at finding as fast as possible...
Persistent link: https://www.econbiz.de/10011736624
This paper is devoted to a comparison of all available branch-and-bound algorithms that can be applied to solve resource-constrained project scheduling problems with multiple execution modes for each activity. After summarizing the two exact algorithms that have been suggested in the literature,...
Persistent link: https://www.econbiz.de/10011736626
Since its advent, the 'just-in-time'-paradigm has considerable influence on production planning and control. While originally employed for high-volume production, 'just-in-time'-concepts are meanwhile documented for low-volume, make-to-order production as well. An example is the assembly of...
Persistent link: https://www.econbiz.de/10011736864