This paper considers two problem classes that are important to researchers as well as practitioners, namely packing and project scheduling problems. First, the two problem categories are described. This includes a classification of packing problems as well as of project scheduling concepts....
Persistent link: https://www.econbiz.de/10011734909
This paper introduces a new general framework for genetic algorithms to solve a broad range of optimization problems. When designing a genetic algorithm, there may be several alternatives for a component such as crossover, mutation or decoding procedure, and it may be difficult to determine the...
Persistent link: https://www.econbiz.de/10011734932
This paper is devoted to a comparison of all available branch-and-bound algorithms that can be applied to solve resource-constrained project scheduling problems with multiple execution modes for each activity. After summarizing the two exact algorithms that have been suggested in the literature,...
Persistent link: https://www.econbiz.de/10011736626
In this paper we consider the resource-constrained project scheduling problem with multiple execution modes for each activity and makespan minimization as objective. We present a new genetic algorithm approach to solve this problem. The genetic encoding is based on a precedence feasible sequence...
Persistent link: https://www.econbiz.de/10011736751
Persistent link: https://www.econbiz.de/10011737223
Persistent link: https://www.econbiz.de/10011737337
Persistent link: https://www.econbiz.de/10011787477
We consider the multi-mode resource-constrained project scheduling problem. The focus is on an algorithm which is supposed to find a makespan optimal solution. This algorithm has been presented in a recent paper by Speranza and Vercellis. The correctness of the algorithm is examined. Moreover,...
Persistent link: https://www.econbiz.de/10011739501
We consider an extension of the classical resource-constrained project scheduling problem (RCPSP), which covers discrete resource-resource and time-resource tradeoffs. As a result a project scheduler is permitted to identify several alternatives or modes of accomplishment for each activity of...
Persistent link: https://www.econbiz.de/10011743239