Showing 1 - 10 of 32
This paper is concerned with the problem of production planning in a flexible manufacturing system consisting of a single or parallel failure-prone machines producing a number of different products. The objective is to choose the rates of production of the various products over time in order to...
Persistent link: https://www.econbiz.de/10012835668
We study a two-period supply chain in which a manufacturer produces a product, learns to reduce cost, and sells it through a retailer with a price-dependent demand. The manufacturer's second-period production cost declines linearly in the first-period production with a random learning rate. The...
Persistent link: https://www.econbiz.de/10012838122
This paper is concerned with the optimal production planning in a dynamic stochastic manufacturing system consisting of a single machine that is failure prone and facing a constant demand. The objective is to choose the rate of production over time in order to minimize the long-run average cost...
Persistent link: https://www.econbiz.de/10012906229
This paper studies multiproduct inventory models with stochastic demands and a warehousing constraint. Finite horizon as well as stationary and nonstationary discounted-cost infinite-horizon problems are addressed. Existence of optimal feedback policies is established under fairly general...
Persistent link: https://www.econbiz.de/10012766626
We consider a production planning problem for a dynamic jobshop producing a number of products and subject to breakdown and repair of machines. The machine capacities are assumed to be finite state Markov chains. As the rates of change of the machine states approach infinity, an asymptotic...
Persistent link: https://www.econbiz.de/10012772135
Focuses on a study which developed a framework for forecast and decision horizons. Definition of finite and infinite horizon stochastic optimization problems for a given forecast; Description of the general framework; Conditions for the existence of a solution horizon; Development of sufficient...
Persistent link: https://www.econbiz.de/10012750265
This paper considers an infinite horizon stochastic production planning problem with the constraint that production rate must be nonnegative. It is shown that an optimal feedback solution exists for the problem. Moreover, this solution is characterized and is then compared with the solution of...
Persistent link: https://www.econbiz.de/10012746449
This paper considers an infinite horizon stochastic production planning problem with demand assumed to be a continuous-time Markov chain. The problems with control (production) and state (inventory) constraints are treated. It is shown that a unique optimal feedback solution exists, after first...
Persistent link: https://www.econbiz.de/10012746800
This paper presents an asymptotic analysis of hierarchical marketing-production systems with stochastic demand and stochastic production capacity modelled as finite state Markov processes. The decision variables used are advertising and production rates which influence capacity, demand, and...
Persistent link: https://www.econbiz.de/10012746801
This paper presents an asymptotic analysis of a stochastic manufacturing system consisting of parallel machines subject to breakdown and repair and facing a constant demand, as the rates of change of the machine states approach infinity. This situation gives rise to a limiting problem in which...
Persistent link: https://www.econbiz.de/10012720681