Showing 1 - 10 of 2,146
Persistent link: https://www.econbiz.de/10011325637
In project management, the project duration can often be compressed by accelerating some of its activities at an additional expense. This is the so-called time-cost tradeoff problem which has been extensively studied in the past. However, the discrete version of the problem which is of great...
Persistent link: https://www.econbiz.de/10011734645
Recently, time-switch constraints have been introduced in literature by Yang and Chen (2000). Basically, these constraints impose a specified starting time on the project activities and force them to be inactive during specified time periods. This type of constraints have been incorporated into...
Persistent link: https://www.econbiz.de/10014105801
A plant construction project always involves lots of activities. Precise information about the activities duration is unfortunately unavailable due to the uncertain resources capacity. The fuzzy program evaluation and review technique (PERT) has been widely applied to solve the fuzzy project...
Persistent link: https://www.econbiz.de/10011898556
We consider a project scheduling problem where the precedence constraints graph is an out-tree. The processing times can be compressed by using additional resources, which causes cost and simultaneously reduces the processing times of jobs. The objective is to minimize the sum of total lateness...
Persistent link: https://www.econbiz.de/10011558722
In project management, the project duration can often be compressed by accelerating some of its activities at an additional expense. This is the so-called time-cost tradeoff problem which has been extensively studied in the past. However, the discrete version of the problem which is of great...
Persistent link: https://www.econbiz.de/10011558760
We consider a model of an information network where nodes can fail and transmission of information is costly. The formation of paths in such networks is modeled as the Nash equilibrium of an N player routing game. The task of obtaining this equilibrium is shown to be NP-Hard. We derive...
Persistent link: https://www.econbiz.de/10010274309
Persistent link: https://www.econbiz.de/10003772269
Persistent link: https://www.econbiz.de/10003319073
Persistent link: https://www.econbiz.de/10009377251