We provide a general framework in which to determine the optimal penalty fee inducing the contractor to respect the contracted delivery date in public procurement contracts (PPCs). We do this by developing a real option model that enables us to investigate the contractor's value of investment...
Persistent link: https://www.econbiz.de/10008823913
This paper considers the supplier's strategic delivery lead time in a public procurement setting as the result of the firm's opportunistic behaviour on the optimal investment timing. In the presence of uncertainty on construction costs, we model the supplier's option to defer the contract's...
Persistent link: https://www.econbiz.de/10009634269
In Italy and in many EU countries, the last decade was characterized by a large development of distributed generation power plants. Their presence determined new critical issues for the design and management of the overall energy system and the electric grid due to the presence of discontinuous...
Persistent link: https://www.econbiz.de/10011548109
We analyze the optimal investment strategy of a monopolist which has subscribed a concession contract to provide a public utility, i.e. water service. We present a strategic model in which a monopolist chooses both the timing of the investment and the capacity. We focus not only on the value of...
Persistent link: https://www.econbiz.de/10011607043
Due to the deployment of distributed renewable energy sources (e.g., solar), the introduction of communication technologies, and the digitalization of the power system (e.g., smart meters, control devices), energy consumers are switching from passive to active in the management of their energy...
Persistent link: https://www.econbiz.de/10013547850
This paper considers the supplier's strategic delivery lead time in a public procurement setting as the result of the firm's opportunistic behaviour on the optimal investment timing. In the presence of uncertainty on construction costs, we model the supplier's option to defer the contract's...
Persistent link: https://www.econbiz.de/10010294334
Procurement (and concession) contracts are agreements granting the right to construct public works, operate and provide a service/good. Themain advantage of a procurement contract is that it passes full responsibility for investment and operations to the private sector and consequentlyprovides...
Persistent link: https://www.econbiz.de/10009443212
We provide a general framework in which to determine the optimal penalty fee inducing the contractor to respect the contracted delivery date in public procurement contracts (PPCs). We do this by developing a real option model that enables us to investigate the contractor's value of investment...
Persistent link: https://www.econbiz.de/10010279528
We provide a general framework in which to determine the optimal penalty fee inducing the contractor to respect the contracted delivery date in public procurement contracts (PPCs). We do this by developing a real option model that enables us to investigate the contractor's value of investment...
Persistent link: https://www.econbiz.de/10013155078
This paper provides a general framework to determine the optimal penalty fee to induce a contractor to respect the contracted delivery date in public procurement contracts (PPCs). We did this by i) developing a real option model to evaluate the investment timing flexibility that the inclusion of...