Showing 1 - 10 of 174,202
Persistent link: https://www.econbiz.de/10010485486
We consider an extension of classic parallel machine scheduling where a set of jobs is scheduled on identical parallel machines and an undirected conflict graph is part of the input. Each node in the graph represents a job and an edge implies that its two jobs are conflicting, meaning that they...
Persistent link: https://www.econbiz.de/10014137590
Traditionally, mathematical optimization methods have been applied in manufacturing industries where production scheduling is one of the most important problems and is being actively researched. Extant studies assume that processing times are known or follow a simple distribution. However, the...
Persistent link: https://www.econbiz.de/10012596666
Persistent link: https://www.econbiz.de/10011674138
lower bounds as well as nine efficient heuristics for solving the problem with the objective of minimizing makespan. The … randomly generated instances indicates that GVNS outperforms other heuristics. The performance of proposed heuristics and meta-heuristics …
Persistent link: https://www.econbiz.de/10012029504
, three construction heuristics and an Ant Colony System (ACS) algorithm are developed for solving this integrated problem …
Persistent link: https://www.econbiz.de/10011305782
In the literature, the application of multi-objective dynamic scheduling problem and simple priority rules are widely studied. Although these rules are not efficient enough due to simplicity and lack of general insight, composite dispatching rules have a very suitable performance because they...
Persistent link: https://www.econbiz.de/10011765286
of meta-heuristics have been proposed in the past. However, tuning algorithm-specific parameters for solving FFSP is … are chosen for the study because these are not only recent meta-heuristics but they do not require tuning of algorithm …
Persistent link: https://www.econbiz.de/10011887964
Purpose: Adjusted discrete Multi-Objective Invasive Weed Optimization (DMOIWO) algorithm, which uses fuzzy dominant approach for ordering, has been proposed to solve No-wait two-stage flexible flow shop scheduling problem. Design/methodology/approach: No-wait two-stage flexible flow shop...
Persistent link: https://www.econbiz.de/10011920773
We consider the problem of scheduling n jobs in a pallet-constrained two-machine flowshop so as to minimize the makespan. In such a flowshop environment, each job needs a pallet the entire time, from the start of its first operation until the completion of the last operation, and the number of...
Persistent link: https://www.econbiz.de/10014211244