Showing 1 - 10 of 173,585
Persistent link: https://www.econbiz.de/10012049458
This article addresses multi-stage assembly flow shop for the first time. We propose several industrial applications of this system in which the opening stage has m parallel machines and the following stages (e.g. assembly, transportation, painting, packaging, etc.) complete and prepare products...
Persistent link: https://www.econbiz.de/10012029504
Maintenance activities can have a large impact on the performance of a production process and promised delivery dates. Therefore, maintenance and production planning should be handled as an integrated problem. In this paper, the problem of scheduling n jobs on m identical parallel machines is...
Persistent link: https://www.econbiz.de/10011305782
Persistent link: https://www.econbiz.de/10011290647
In the literature, the application of multi-objective dynamic scheduling problem and simple priority rules are widely studied. Although these rules are not efficient enough due to simplicity and lack of general insight, composite dispatching rules have a very suitable performance because they...
Persistent link: https://www.econbiz.de/10011765286
Flexible flow shop (or a hybrid flow shop) scheduling problem is an extension of classical flow shop scheduling problem. In a simple flow shop configuration, a job having ‘g’ operations is performed on ‘g’ operation centres (stages) with each stage having only one machine. If any stage...
Persistent link: https://www.econbiz.de/10011887964
Purpose: Adjusted discrete Multi-Objective Invasive Weed Optimization (DMOIWO) algorithm, which uses fuzzy dominant approach for ordering, has been proposed to solve No-wait two-stage flexible flow shop scheduling problem. Design/methodology/approach: No-wait two-stage flexible flow shop...
Persistent link: https://www.econbiz.de/10011920773
Persistent link: https://www.econbiz.de/10010485486
Persistent link: https://www.econbiz.de/10003731850
We consider the problem of scheduling n jobs in a pallet-constrained two-machine flowshop so as to minimize the makespan. In such a flowshop environment, each job needs a pallet the entire time, from the start of its first operation until the completion of the last operation, and the number of...
Persistent link: https://www.econbiz.de/10014211244