Showing 1 - 10 of 180,253
In a conventional dial-a-ride-system passengers are moved with the same vehicle between their pickup and their drop-off location. In a dial-a-ride-system with transfer, it is possible (or even standard) that passengers change the vehicle once or several times. Transfer Scheduling Constraints...
Persistent link: https://www.econbiz.de/10011300632
Persistent link: https://www.econbiz.de/10003977606
Persistent link: https://www.econbiz.de/10003561605
Persistent link: https://www.econbiz.de/10003511817
Persistent link: https://www.econbiz.de/10003984764
Persistent link: https://www.econbiz.de/10003984931
Persistent link: https://www.econbiz.de/10003942698
Persistent link: https://www.econbiz.de/10009008888
We study a class of scheduling problems involving the maximumlateness criterion and an element of batching. For all the problemsthat we examine, algorithms appear in the literature which consistof a sorting step to determine an optimal job sequence, followedby a dynamic programming step which...
Persistent link: https://www.econbiz.de/10011301157
Persistent link: https://www.econbiz.de/10010357811