Showing 1 - 10 of 1,774
Mixed-model assembly lines are increasingly accepted in many industrial environments to meet the growing trend of greater product variability, diversification of customer demands, and shorter life cycles. In this research, a new mathematical model is presented considering balancing a mixed-model...
Persistent link: https://www.econbiz.de/10011565314
This article focuses on the Mixed-Model Assembly Line Balancing single-target problem of type 2 with single-sided linear assembly line configurations, which is common in the industrial environment of small and medium-sized enterprises (SMEs). The main objective is to achieve Algorithmic...
Persistent link: https://www.econbiz.de/10012880408
Purpose: Time and Space assembly line balancing problem (TSALBP) is the problem of balancing the line taking the area required by the task and to store the tools into consideration. This area is important to be considered to minimize unplanned traveling distance by the workers and consequently...
Persistent link: https://www.econbiz.de/10012814907
Assembly plays an important role in any production system as it constitutes a significant portion of the lead time and cost of a product. Virtual computer-integrated manufacturing (VCIM) system is a modern production system being conceptually developed to extend the application of traditional...
Persistent link: https://www.econbiz.de/10011765257
This paper addresses a new Mixed-model Assembly Line Sequencing Problem in the Footwear industry. This problem emerges in a large company, which benefits from advanced automated stitching systems. However, these systems need to be managed and optimised. Operators with varied abilities operate...
Persistent link: https://www.econbiz.de/10012596628
Persistent link: https://www.econbiz.de/10014323631
Persistent link: https://www.econbiz.de/10009156449
Persistent link: https://www.econbiz.de/10010202634
We treat the n-job, two-stage hybrid flowshop problem with one machine in the first stage and two different machines in parallel in the second stage. The objective is to minimize the makespan. We demonstrate that the problem is NP-complete. We formulate a dynamic program, which is beyond our...
Persistent link: https://www.econbiz.de/10012921635
We considered a mixed corrective maintenance policy for machines in a two-machine onebuffer flow line. The machines had stochastic processing times and suffered from unexpected failures. In the case of a failure, the machines were either minimally repaired or their failing components were...
Persistent link: https://www.econbiz.de/10013171088