The purpose of this paper is to propose models for project scheduling when there is considerable uncertainty in the activity durations, to the extent that the decision maker cannot with confidence associate probabilities with the possible outcomes of a decision.Our modeling techniques stem from...
Persistent link: https://www.econbiz.de/10013131037
We study the stochastic resource-constrained project scheduling problem or SRCPSP, where project activities have stochastic durations. A solution is a scheduling policy, and we propose a new class of policies that is a generalization of most of the classes described in the literature. A policy...
Persistent link: https://www.econbiz.de/10013000148
In this paper we present a heuristic methodology for solving resource-constrained project scheduling problems with renewable and spatial resources. We especially concentrate on spatial resources that are encountered in construction projects, but our analysis can easily be generalized to other...
Persistent link: https://www.econbiz.de/10012725657
The completion of a typical project hinges upon receiving all the purchased components by thetime they are scheduled to be used. Some of these components may have long stochastic leadtimes, so the project manager is tempted to order them ASAP, to avoid the (usual) high penaltiesassociated with...
Persistent link: https://www.econbiz.de/10012769457
We present a globally optimal solution procedure to tackle the preemptive stochastic resource-constrained project scheduling problem (PSRCPSP). A solution to the PSRCPSP is a policy that allows to construct a precedence- and resource-feasible schedule that minimizes the expected makespan of a...
Persistent link: https://www.econbiz.de/10012978837
We study the resource-constrained project scheduling problem with stochastic activity durations. We introduce a new class of scheduling policies for this problem, which make a number of a-priori sequencing decisions in a pre-processing phase, while the remaining decisions are made dynamically...
Persistent link: https://www.econbiz.de/10012718373