Showing 1 - 7 of 7
The production constraints and economics of peach (Prunus persica (L) Batsch.) cultivation in Punjab and Uttarakhand have been presented. The investment in peach orchards has been found a profitable business. The internal rate of return (IRR) has been found to vary from 20.98 per cent to 23.80...
Persistent link: https://www.econbiz.de/10005476792
In this paper, teaching–learning-based optimization (TLBO) is proposed to solve flexible job shop scheduling problem (FJSP) based on the integrated approach with an objective to minimize makespan. An FJSP is an extension of basic job-shop scheduling problem. There are two sub problems in FJSP....
Persistent link: https://www.econbiz.de/10012020105
Flexible flow shop (or a hybrid flow shop) scheduling problem is an extension of classical flow shop scheduling problem. In a simple flow shop configuration, a job having ‘g’ operations is performed on ‘g’ operation centres (stages) with each stage having only one machine. If any stage...
Persistent link: https://www.econbiz.de/10011887964
Ergonomic design of a product considers design, cognitive and behavioral information during the design stage with a view to improve the comfort level of the user and aesthetic look of the product. However, a large number of products are available in the market place possessing a wide range of...
Persistent link: https://www.econbiz.de/10011956977
Flexible flow shop (or a hybrid flow shop) scheduling problem is an extension of classical flow shop scheduling problem. In a simple flow shop configuration, a job having 'g' operations is performed on 'g' operation centres (stages) with each stage having only one machine. If any stage contains...
Persistent link: https://www.econbiz.de/10011995854
Ergonomic design of a product considers design, cognitive and behavioral information during the design stage with a view to improve the comfort level of the user and aesthetic look of the product. However, a large number of products are available in the market place possessing a wide range of...
Persistent link: https://www.econbiz.de/10012662731
In this paper, teaching-learning-based optimization (TLBO) is proposed to solve flexible job shop scheduling problem (FJSP) based on the integrated approach with an objective to minimize makespan. An FJSP is an extension of basic job-shop scheduling problem. There are two sub problems in FJSP....
Persistent link: https://www.econbiz.de/10013470780