Showing 1 - 10 of 178,153
Persistent link: https://www.econbiz.de/10015049216
This note deals with the problem of minimising the expected sum of quadratic holding and shortage inventory costs when a single, failure-prone machine produces multiple part-types. Shu and Perkins (2001) introduce the problem and, by restricting the set of control policies to the class of...
Persistent link: https://www.econbiz.de/10011899030
time period, their economic amounts, and their scheduling within each period. This outcome should help decision makers …
Persistent link: https://www.econbiz.de/10011903343
This article addresses multi-stage assembly flow shop for the first time. We propose several industrial applications of this system in which the opening stage has m parallel machines and the following stages (e.g. assembly, transportation, painting, packaging, etc.) complete and prepare products...
Persistent link: https://www.econbiz.de/10012029504
This contribution summarizes recent work in the field of lot sizing and scheduling. The objective is not to give a …-level lot sizing and scheduling. The paper concludes with some advice for future research activities. …
Persistent link: https://www.econbiz.de/10011808819
Persistent link: https://www.econbiz.de/10012316363
Purpose: The purpose of this paper is to study the effect of selected scheduling dispatching rules on the performance … different scheduling rules with respect to mean flow time, machine efficiency and total run time as performance measures …, three scheduling dispatching rules (First In/First Out (FIFO), EDD, SPT) were used. In future research, the effect of other …
Persistent link: https://www.econbiz.de/10011899932
Persistent link: https://www.econbiz.de/10014566036
Persistent link: https://www.econbiz.de/10014575589
Persistent link: https://www.econbiz.de/10014634626