We consider the problem of scheduling multiple, large-scale, make-to-order assemblies under resource, assembly area, and part availability constraints. Such problems typically occur in the assembly of high volume, discrete make-to-order products. Based on a list scheduling procedure which has...
Persistent link: https://www.econbiz.de/10011737305
We consider the classical resource-constrained project scheduling problem (RCPSP). The paper gives a detailed algorithmic description and provides theoretical results on two widely known problem specific heuristics: The serial and the parallel scheduling scheme. An in-depth computational study...
Persistent link: https://www.econbiz.de/10011739559
We review the well-known RSM priority rule to solve the resource constrained project scheduling problem. A detailed analysis of this rule reveals that it is based on assumptions which do not hold in general and hence might lead to poor solutions. Consequently, an improved RSM priority rule is...
Persistent link: https://www.econbiz.de/10011739746
Investment projects consist of activities which are interrelated by techno-logical and resource constraints. The timing of payments depends on the scheduling of the activities which is not known a priory. Hence, the decision to be made, is to find a feasible Investment schedule with maximum net...
Persistent link: https://www.econbiz.de/10011808794
We consider a generalization of the classical resource constrained project scheduling problem. We introduce so-called partially reiiewable resources by assuming for each resource a capacity on subsets of periods. The concept of partially renewable resources is a fundamental tool in order to make...
Persistent link: https://www.econbiz.de/10011799792
Im vorliegenden Beitrag wurde auf Investitionsplanungsprobleme bei Berücksichtigung unterschiedlicher Interdependenzen eingegangen. Wir haben Modelle und Methoden für die Planung bei Existenz eines vollständigen und unbeschränkten Kapitalmarkts vorgestellt. Geeignete Verfahren für die...
Persistent link: https://www.econbiz.de/10011799797
Persistent link: https://www.econbiz.de/10011817522
The problem of scheduling multiple, large scale, make-to-order assemblies is considered. Beside "classical" precedence- and resource constraints as known from resource constrained project scheduling we take spatial resource and part availability constraints into account. The objective is to...
Persistent link: https://www.econbiz.de/10011558728
Persistent link: https://www.econbiz.de/10011558729
Persistent link: https://www.econbiz.de/10011558734