Showing 1 - 8 of 8
Persistent link: https://www.econbiz.de/10014560652
Flow-shop scheduling problem (FSP) deals with the scheduling of a set of n jobs that visit a set of m machines in the same order. As the FSP is NP-hard, there is no efficient algorithm to reach the optimal solution of the problem. To minimize the holding, delay and setup costs of large...
Persistent link: https://www.econbiz.de/10011556480
The demand forecasting is essential for all production and non-production systems. However, nowadays there are only few researches on this area. Most of researches somehow benefited from simulation in the conditions of demand uncertainty. But this paper presents an iterative method to find most...
Persistent link: https://www.econbiz.de/10011556537
Usually, in monitoring a proportion p, the binary observations are considered independent; however, in many real cases, there is a continuous stream of autocorrelated binary observations in which a two-state Markov chain model is applied with first-order dependence. On the other hand, the...
Persistent link: https://www.econbiz.de/10012020126
Preventive maintenance is the essential part of many maintenance plans. From the production point of view, the flexibility of the maintenance intervals enhances the manufacturing efficiency. On the contrary, the maintenance departments tend to know the timing of the long term maintenance plans...
Persistent link: https://www.econbiz.de/10012164822
Usually, in monitoring a proportion p, the binary observations are considered independent; however, in many real cases, there is a continuous stream of autocorrelated binary observations in which a two-state Markov chain model is applied with first-order dependence. On the other hand, the...
Persistent link: https://www.econbiz.de/10013470789
Preventive maintenance is the essential part of many maintenance plans. From the production point of view, the flexibility of the maintenance intervals enhances the manufacturing efficiency. On the contrary, the maintenance departments tend to know the timing of the long term maintenance plans...
Persistent link: https://www.econbiz.de/10013470813
Many real projects complete through the realization of one and only one path of various possible network paths. Here, these networks are called alternative stochastic networks (ASNs). It is supposed that the nodes of considered network are probabilistic with exclusive-or receiver and...
Persistent link: https://www.econbiz.de/10010317865